Since FFANTASI’s successful arrival at GB CWA on: 11/7/25 @ 1541 Arrival Date & Time (ATA), since getting the vessel to GB CWA – Conwy Marina there has been a string of electrical faults onboard. As Vanguard II is scheduled to come out of the water on December 16, 2025, and starting from today: December 5, 2025 – I will be focusing all my attention on FFANTASI.
FFANTASI’s electrical faults need to be addressed, as there is no point within navigational equipment such as using your cellular device to help with navigational purposes. I do know what I am doing with boats, people have often taken me for face value, and my knowledge of navigation. I do have an equivalent license to RYA, but my license isn’t recognized in the U.K / Europe.
List of Jobs Required:
- Sort Electrical Faults out.
- Sort why the ignition approved volvo parts is blowing every time.
- Replace ignition.
- Replace starter motor.
I am not looking for someone to help sort these issues out, I am looking for someone who’s willing to help and support. I’m already paying close to £400 a month to have FFANTASI moored at Conwy Marina. I’m not getting paid myself for jobs being done to both vessels.
Sea Trial’s Booked With Marina:
We will commence Sea Trial’s, once Electrical Faults have been addressed, and once I’ve tuned the engine up.
Thanks,
Captain Christopher Abbott.